Construction progress for May 2024
27.05.2024
Go back
The DIM company performs work at the construction site on the street. Olehivska, 36.
In May, the following works were performed at the construction site:
Section 1:
- Concreting reinforcement of vertical structures up to -0.000 - 95%
Section 2:
- Reinforcement of concreting of the 3rd floor and structures - 35%
Section 3:
- Reinforcement of concreting of the 3rd floor and structures - 35%
Section 4:
- Reinforcement of concreting of vertical structures of the 2nd floor - 55%
Section 5:
- Reinforcement of concreting of vertical structures of the lower part of the section - 25%