support icon
2024
OLEGIV Podil
Construction progress for January 2024

22.01.2024

Go back

OLEGIV Podil by DIM is under active construction.

In January, the following works were performed at the construction site:

Section 1:

  • Reinforcement of concreting of vertical structures up to -0.000 - 80%

Section 2:

  • Reinforcement of concreting of vertical structures up to -0.000 - 80%

Section 3:

  • Concreting reinforcement of vertical structures up to -0.000 - 95%

Section 4:

  • Concreting reinforcement of vertical structures up to -0.000 - 95% (lower part)

Parking I zone:

  • Backfilling, soil compaction, preparation of the area of the section for the installation of the power plate - 95%
  • Reinforcement of concrete slab - 90%

Parking II zone:

  • Reinforcement of concreting of vertical structures up to -0.000 - 90% (lower part)
  • Reinforcement of concreting of the floor slab of the lower part of the building -1,500 – 50%