The DIM company performs work at the construction site on the street. Olehivska, 36.
In April, the following works were performed at the construction site:
Section 1:
- Reinforcement of concreting of vertical structures up to -0.000 - 90%
Section 2:
- Reinforcement of concreting floors 1, 2 and structures - 100%
- Reinforcement of concreting of the 3rd floor - 15%
Section 3:
- Reinforcement of concreting floors 1, 2 and structures - 100%
- Reinforcement of concreting of the 3rd floor - 15%
Section 4:
- Reinforcement of concreting of vertical structures of the 1st floor - 100%
Section 5:
- Reinforcement of concrete slab - 100%