The DIM company performs work at the construction site on the street. Olehivska, 36.

In April, the following works were performed at the construction site:

Section 1:

  • Reinforcement of concreting of vertical structures up to -0.000 - 90%

Section 2:

  • Reinforcement of concreting floors 1, 2 and structures - 100%
  • Reinforcement of concreting of the 3rd floor - 15%

Section 3:

  • Reinforcement of concreting floors 1, 2 and structures - 100%
  • Reinforcement of concreting of the 3rd floor - 15%

Section 4:

  • Reinforcement of concreting of vertical structures of the 1st floor - 100%

Section 5:

  • Reinforcement of concrete slab - 100%